Terminal and flights
Construction began on 27 July 2023 and the main works were finished by 1 September; the terminal is designed for 30 passengers at a time. The runway was rebuilt in June 2024, and on 22 June an Airbus A320neo technical flight arrived from Tashkent.
The scheduled route is Tashkent–Zomin (Silk Avia, listed in its February 2026 fares). The board for 20–22 October 2026 showed one flight to Tashkent.
Getting to town
Zomin town is about 10 km away by road. There is no verified information on public transport, so take a taxi or arrange a transfer in advance.
Checked: 2026-10